Building a house, shophouse or office is one of the biggest purchases most people ever make. Yet the most important decisions are often rushed at the start: the design isn't finished, the budget is only a guess, and details like waterproofing are left for later. The result can be leaks, cost blowouts, a building that doesn't meet the rules or, at worst, a project that stalls halfway. Here are five things to sort out before you build.
1. Zoning rules and the layout inside the building
Check the land rules before you finalise the design. Every block of land has limits set by the local government. A few terms you should know:
| Term | What it means | Why it matters |
|---|---|---|
| GSB (building setback line) | The minimum distance between the building and the road boundary or front fence | Sets how far forward you can build |
| KDB (building coverage ratio) | The maximum percentage of the land the building may cover | Limits the ground floor area |
| KLB (floor area ratio) | The total floor area of all levels compared with the land area | Limits the number of storeys and the total building size |
| KDH (green area ratio) | The minimum percentage of land kept for green space or water absorption | You must leave part of the land open |
These rules apply to many kinds of projects:
- Homes and major renovations: they make sure the house gets enough airflow and natural light, doesn't take over the road verge, and leaves soil for rainwater to soak in so the neighbourhood doesn't flood.
- Shophouses, cafés and commercial buildings: councils watch the GSB closely (so parking doesn't spill onto the road) and the KDH (because commercial sites tend to cover the whole block with concrete or asphalt).
- Multi-storey buildings, hotels and apartments: the KLB matters most here, to limit density in an area and match the building's capacity to the city's infrastructure (road width, drainage and power).
- Housing estates (clusters or lots) and industrial estates: the rules apply to each lot and to the estate as a whole, to make sure there are public facilities and green open space.
The values differ from area to area. You can find them in the spatial planning compliance document (KKPR or KRK) from the local planning office. Since 2021, the building permit is no longer the IMB but the PBG (Persetujuan Bangunan Gedung, building approval), which you apply for through the SIMBG system. Get this approval before construction starts. A building without a PBG can be penalised and is harder to sell or use as collateral.
Keep the service route separate from private areas. Besides the government's rules, there are layout rules inside the building itself. A comfortable home is usually divided into three zones:
| Zone | Example rooms | Principle |
|---|---|---|
| Public | Terrace, living room or foyer | Easy for guests to reach from the front door |
| Private | Bedrooms, ensuites, family room | Not crossed by guests or service activity |
| Service | Wet kitchen, laundry and drying area, storeroom, household staff room, carport | Has its own route, ideally through a side or back door |
The service route is the path used for daily tasks such as delivering water gallons and gas bottles, taking out rubbish, washing and hanging out clothes. If this route has to pass through the living room or family room, you lose privacy, and the floors in the main rooms get dirty and wear out faster.
Floor plan tips:
- Group the kitchen, laundry and storeroom near the service door. Keeping these rooms together makes daily tasks easier, such as unloading shopping or hanging out washing, without dirtying the public rooms or disturbing the private ones.
- Stack upstairs bathrooms over downstairs wet areas. Lining up the upstairs bathroom with a downstairs bathroom or kitchen keeps the clean and waste water pipes shorter, with fewer bends, easier maintenance and less risk of hidden leaks.
- Plan an accessible vertical shaft and inspection pits. Put a pipe shaft in the service area or next to the bathrooms with an access panel (for example in the ceiling or a service wall), and place inspection pits along the outside drainage line where they're easy to reach. That way a plumber can check or fix pipes without breaking up the granite or ceramic floor.
- Separate clean circulation from service circulation. Make sure guests don't look straight at the clothesline or the clutter in the storeroom, and keep cross-ventilation so cooking smells and laundry humidity don't reach the bedrooms.
- Match the flooring to each zone. Use granite tile in public areas and busy hallways because it is hard-wearing, strong and easy to clean. Use anti-slip flooring (matt or textured) in wet service areas such as the laundry, bathrooms and wet terraces to prevent slips.
2. The physical condition of the land
| What to check | Why it matters | Simple way to check |
|---|---|---|
| Soil type | Filled land or former rice fields are softer and can subside, so the foundations need to be stronger | Ask neighbours about the land's history. A soil investigation isn't required for houses up to 2 storeys, but still ask an engineer or experienced site foreman to assess it |
| Flood risk | A floor lower than the road will take in water in heavy rain | Ask neighbours how high the worst flooding has been, then set the floor level above it |
| Drainage | Rainwater and wastewater need a clear way out | Find the local drains and which way they flow |
| Road access | If a materials truck can't get in, materials have to be carried in stages, which costs extra | Measure the road width and check for barriers or tight corners |
3. Waterproofing: plan it before the tiles go down
Waterproofing is a watertight layer that stops water seeping through. It's almost invisible once the building is finished, so people often cut corners on it. But fixing a leak after the tiles and ceiling are in costs far more than doing it properly from the start.
Areas that must be waterproofed:
- Concrete slabs and flat roofs
- Bathroom floors, and shower walls to a height of about 180 to 200 cm
- Balconies, upper terraces and rooftop gardens
- Laundries and wet kitchens
- Water tanks and pools
- Walls and floors in direct contact with the ground, including basements
4. Budgeting: be realistic from the start
A realistic budget isn't just a total figure, but also how it's split. As a rough guide, the cost of building a house usually breaks down like this (the actual percentages depend on the design and specifications):
| Work group | Approximate share* |
|---|---|
| Structure (foundations, columns, beams, slabs, roof) | About 30 to 40% |
| Architecture and finishes (walls, floors, frames, ceilings, paint) | About 30 to 40% |
| Mechanical, electrical and plumbing (power, clean water, wastewater) | About 10 to 20% |
| Contingency | 10 to 15% of the total |
*The shares can be adjusted to your own needs and preferences.
Costs people often forget:
- Architectural design, construction drawings and structural calculations
- Permit fees (PBG levy) and power and water connections
- Project supervision
- Fences, carport, terrace, garden and outdoor drainage
- Furniture, kitchen joinery, lighting and curtains
- Material price rises during the project
Choose the right contract type. There are three common options:
| Type | How it works | Advantages | Watch out for |
|---|---|---|---|
| Full contract | The contractor supplies materials and labour | More certain cost, less hassle for the owner | Material specifications must be written down clearly |
| Labour-only contract | The owner supplies materials; builders are paid per job | The owner controls material brands and quality | The owner has to manage purchasing and delivery schedules |
| Day rate | Builders are paid per day | Flexible for small renovations | Costs are hard to control if the work runs late |
Whatever the type, pay in stages (progress payments) based on work that's finished, not on time elapsed.
5. RAB: a detailed cost estimate
An RAB (Rencana Anggaran Biaya, itemised cost estimate) lists every job with its quantity and price. A good RAB lets you compare contractor quotes fairly, keep costs under control and avoid surprise extras.
The basic formula for each RAB item:
Quantity of work × unit rate = cost of the work
The unit rate is made up of materials, labour and equipment. The government publishes AHSP (Analisa Harga Satuan Pekerjaan, unit rate analysis) guidelines, which are often used as a reference for working out the materials and labour needed per unit of work.
The usual order of work in an RAB:
- Preparation (site clearing, surveying, site office)
- Design and permits (architect and engineer fees, design costs, PBG levy)
- Earthworks and foundations
- Structure (ground beams, columns, beams, floor slabs)
- Walls and rendering
- Roofing
- Waterproofing
- Finishes:
- Floors and walls (granite tile, ceramic tile)
- Sanitaryware (toilets, basins, taps, showers)
- Frames, doors and windows
- Ceilings and painting
- Services: mechanical, electrical, septic tank and plumbing
- External works (fences, carport, drainage)
- Support costs: supervision, equipment hire, material transport, meals for the builders
Set aside a contingency of at least 10%. It covers things that almost always happen: material prices rise mid-project, extra work comes up, or the design changes once you see the building standing. For a renovation of an older home, the contingency should be larger, because hidden damage only shows up once things are opened up.
Lock in prices for major materials early. Get written quotes for granite tile, ceramic tile and sanitaryware at the RAB stage, then add 5 to 10% to the quantities for cuts and spare tiles for repairs. Buying from a single production batch also avoids colour differences between boxes.
Check whether you qualify for a PBG levy waiver. Since a joint decree by three ministers in late 2024, the PBG levy has been waived for low-income households that meet the criteria. In Java, the income limit is Rp7 million a month for single people and Rp8 million for married couples, for self-built homes of up to 48 m². How it's applied depends on the local government, so ask the relevant office directly.
Tips for preparing an RAB:
- Write full specifications: brand, type, size and finish. Items without specifications leave room for materials to be swapped for lower-quality ones.
- Include a cutting allowance for ceramic and granite tile, around 5 to 10% depending on the laying pattern. Our Tile Calculator can help you work it out.
- Get written supplier quotes for the main materials and put them into the RAB.
- Compare at least three contractors using the same RAB and specifications.
- Agree in writing on how variations (added or removed work) will be handled before the project starts.
Checklist before construction starts
- Land rules (GSB, KDB, KLB, KDH) have been checked and the design complies.
- The PBG has been applied for or issued.
- The floor plan separates public, private and service zones, including pipe routes and shafts.
- Every wet area is in the waterproofing plan, including a flood test.
- The budget includes a 10 to 15% contingency.
- The RAB is detailed down to material brands and specifications.
- Supplier quotes for the main materials are in hand.
- The contract type and payment stages are agreed in writing.
Conclusion
Time spent on planning saves money and effort during construction. Make sure the building meets the zoning rules, the floor plan keeps the service route away from private areas, every wet area is waterproofed, the budget has a contingency, and the RAB is written in detail down to material specifications.